
Study and Design of Osogbo East Bypass Road Project
Project Description
Study and Design of Osogbo East Bypass Road Project
Topographical Survey, preparation of detailed engineering design, including preparation of drawings and tender documents.
Project Information
Client: Osun State Government
Duration: 6 months (2011)