Study and Design of Osogbo East Bypass Road Project

Study and Design of Osogbo East Bypass Road Project

Project Description

Study and Design of Osogbo East Bypass Road Project

Topographical Survey, preparation of detailed engineering design, including preparation of drawings and tender documents.

Project Information

Client: Osun State Government

Duration: 6 months (2011)

Date

22 February 2018

Tags

Highway and Bridges